This exceptionally produced trainee guide features a highly illustrated
design, technical hints and tips from industry experts, review questions
and a whole lot more! Key content includes General Maintenance and
Winterizing Pipeline Equipment, Pipeline Damage Inspection (CT 34 and
35), Performing In-Line Inspections (CT 29), Pipeline Repair (CT 9.5,
37, 40.1, 40.2, 40.3, 40.4, 40.5, 40.7, and 40.91), Relocating and
Lowering Pipelines (CT 33 and 34), Hot Tapping and Stoppling(R) - 2.5"
and Larger (CT 40.6, 40.8, 40.9, and 40.91), Tank Repair, Maintenance
Welding on Pipelines (CT 42), Performing Pipeline Disconnection
Procedures (CT 36) and Vault Maintenance and Confined Space Entry (CT
59).
Instructor Supplements
Instructors: Product supplements may be ordered directly through OASIS
at http: //oasis.pearson.com. For more information contact your Pearson
NCCER/Contren Sales Specialist at http:
//nccer.pearsonconstructionbooks.com/store/sales.aspx.
- Annotated Instructor's Guide Paperback 0-13-101078-6
- Computerized Testing Software 0-13-103328-X
- Transparency Masters 0-13-103329-8