In our country a few Gas Insulated Substations (GIS) units have been in
operation and large number of units are under various stages of
installation. Although GIS have been in operation for several years,
some of the problems need attention. These problems include, generation
of over voltage during dis-connector operations, line to enclosure
faults etc. These over voltages are caused in two ways, viz., due to
switching operations of circuit breaker and line to enclosure faults. In
the project work, very fast transient over voltages are generated due to
switching operations have been analyzed and presented. Since the contact
speed of dis-connector switches is low, re-striking occurs many times
before the current interruption is completed. Each re-striking generates
transient over voltage with different levels of magnitude. Since these
transients have traveling wave behavior, they travel to the external
systems through enclosures, bushings, cable joints etc., and cause
damage to the outside equipment. They can lead to secondary break downs
in GIS and may give rise to electromagnetic interference.It is important
to develop a suitable simulation models for estimation of these
voltages.